With the weather forecast predicting no rain today (Wednesday 13 March 2024), Alan decided it was a good time to go in the cemetery to finish off the Rossiter N24 grave. The missing corner of the inner slab was filled with concrete with a drainage hole made to allow the rain water to flow through. The whole of the inner slab was then covered with stone chipping. Two wheelbarrows of earth were spread around the grave to level and tidy the area. After weeks of work this grave is at last completed, a pity that two of the posts are missing. Photo taken. Alan was well pleased with the result.